


SITE SITUATION: - Client was setting up a cement grinding unit of 120 tph capacity, where the clinker will be ground in a ball mill. This ball mill was housed in a RCC building which is 3 side opened. The noise level at 1 mtr distance would be 120 db while mill running empty and 100 db in loaded condition.